Securing reliable drinking water for Al Muthanna communities

A sustainable drinking water infrastructure for the districts of Al Khidr and Al Daraji will provide a reliable water supply for around 160,000 people.

The rising salinity of the Euphrates and outdated water treatment plants mean that the water quality meets neither WHO nor Iraqi standards. As a result, many households rely on drinking water from private provider, which places a particular burden on low-income families.

Rising salinity in the Euphrates River and outdated treatment plants have resulted in water quality that no longer meets either WHO or Iraqi standards. As a result, many households rely on drinking water from private providers, which places a particular burden on low-income families.

To address these challenges, a new drinking water supply system is being developed for the Iraqi Ministry of Construction, Housing and Public Municipalities (MoCHPM), financed by KfW Development Bank on behalf of the German Government. It comprises a modern water treatment plant, reservoirs, pumping stations and an expanded distribution network. Dorsch Impact and ECG are responsible for engineering design, construction supervision, environmental and social management and capacity building for the Al Muthanna Water Directorate, laying the foundation for a reliable, affordable and sustainable supply. 

Disciplines

  • Water
  • Water Supply
  • Climate Mitigation & Adaptation

Companies

ECG Engineering Consultants Group S.A.

Dorsch Impact GmbH

Client

Ministry of Construction, Housing and Public Municipalities (MoCHPM), funded by the German Government through KfW Development Bank

Duration

From 2024 to 2029

Location

Al Muthanna Governorate (districts of Al Khidr and Al Daraji), Iraq

Project Activities

  • Planning and detailed design of the new water treatment plant, reservoirs, pumping stations and distribution networks
  • Design of an environmentally sound brine disposal solution
  • Tendering, procurement and contract management according to KfW guidelines and FIDIC
  • Construction supervision, including the 12-month defect notification period and O&M support for the treatment plant
  • Environmental and social impact assessment (ESIA/ESMP), stakeholder engagement and monitoring
  • Capacity building for the Al Muthanna Water Directorate: operation & maintenance, tariff roadmap, public awareness and gender equity 

Impact

  • Reliable access to safe drinking water for around 160,000 people, meeting WHO and Iraqi standards
  • Reduced salinity challenges and less dependence on private water vendors, easing the burden on low-income households
  • Strengthened operational and financial capacities of the Al Muthanna Water Directorate
  • A metered network designed to reduce non-revenue water and improve resilience for growing communities 

Contributing to the UN Sustainable Development Goals

We are committed to making a positive impact and supporting the UN Sustainable Development Goals (SDGs). This project contributes to the following SDGs:

Clean water and sanitation
Climate action

Companies