School Construction Programme

The influx of Syrian refugees resulted in challenges for the Jordanian education system. Overcrowding and double shifts result in inequitable learning conditions and decreased education quality. The need for additional schools is recognised in the Jordanian Response Plan (JPR) to the Syrian crisis. 

The overall development objective of this project is to contribute to the improvement of personal and economic development perspectives for Jordanian and Syrian children to serve as a basis for stability, peace and prosperity in the region. The SCP specifically aims to improve learning conditions in the field of basic education in selected project areas through the provision and adequate utilisation of additional school infrastructure, ensuring complete equitable and quality access to primary and secondary education. 

The School Construction Programme is composed of two components: 
 

  1. FC Component funded by the German Government through KfW Development Bank- Construction of up to 13 new schools or school extensions. 

  2. EU Component funded by the European Union- Construction of 10 new schools and complementary measures. 

Bird view of modern school building with solar panels on the roof and external recreational areas.

Disciplines

  • Municipal Infrastructure

Companies

Dorsch Impact GmbH

Client

Ministry of Public Works and Housing (MoPWH), financed by KfW / EU

Duration

From 2019 to 2024

Location

Jordan

Project Activities

  • Consideration of optimised urban planning/master plan approach taking future extensions and integration in surrounding area and vegetation, energy efficiency and integration of renewable energy, quality of internal but also external spaces, access for disabled people, maintenance friendliness, specialised rooms such as computer and science laboratories, and modern school furniture. 

  • Individual design of “Child-Centered Fully Functional Schools”, considering school buildings as an integral part of the educational process and integrating aspects of the “21st Century School” concept as far as appropriate in the Jordanian context.

  • Net Zero Energy and Sustainability: Schools are designed as Net Zero Energy Buildings, integrating solar power, energy-efficient design, water-saving measures, and environmentally friendly materials to reduce environmental impact.
  • Ensuring access for disabled people and inclusive design for all students.
  • Creation of community-oriented spaces, including sports fields and multipurpose halls, supporting social inclusion, and community engagement.

Contributing to the UN Sustainable Development Goals

We are committed to making a positive impact and supporting the UN Sustainable Development Goals (SDGs). This project contributes to the following SDGs:

Quality Education
Gender equality
Decent work and economic growth

Companies

Dorsch Impact GmbH

Project Images

Bird view of a school building with solar panels on the roof and external recreational areas.