Master Plan & Infrastructure Design for Aseer Second Industrial City
The main objective was to implement and develop a master plan and infrastructure for Aseer Second Industrial City (approximately 18.7 km2) at a concept level and proceed to detailed master plan and infrastructure .
Areas of Expertise
- Mobility
- Masterplanning
Companies
Dorsch KSA
Client
Saudi Authority for Industrial Cities and Technology Zones (MODON)
Duration
From 2019 to 2021
Location
Khamis Mushayt, Saudi Arabia
Construction Costs
SAR 4.5 Billion
Project Activities
- Site appraisal and data collection
- EIA
- Transportation assessment
- Market study
- Feasibility & business plan
- Concept master plan city wide (18.7 km2)
- Concept infrastructure city wide (18.7 km2)
- Detailed master plan (3 km2)
- Detailed infrastructure design
- Tender & IFC package