Consutlancy Services for Taif-Baha Water Transmission System
The project comprises engineering services for the construction of a 217 km pipeline network of diameter 40 inches which will deliver desalinated water from Taif (Reservoir to be built: 80,000 m3) to Baha (existing strategic reservoir: 300,000 m3), a fresh water pumping station will supply 80,000 m3/d with tap-off stations at Sudraya, Shuqsan, Ghazayel and Hadan, Abo Raka and Arada.
Disciplines
- Sanitation
- Water Supply
Companies
Dorsch Holding GmbH KSA
Client
Saline Water Conversion Corporation (SWCC)
Duration
From 2010 to 2015
Location
Ghazaial, Saudi Arabia
Project Activities
- Design review
- Construction supervision
- Project management
Contact
Dorsch Holding GmbH KSA
Riyadh (Headquarters)
8498 King Fahd Road, Al Mohammadiyyah District
Unit No: 7499
Riyadh 12363 4218
Kingdom of Saudi Arabia
Unit No: 7499
Riyadh 12363 4218
Kingdom of Saudi Arabia
E-Mail: ksa@dorsch.com
Fax: +966 11 433 6664